After a week of refinishing the floor, Rach gets her final construction inspection. 8 months later, the final push is…
Read More
006. Home Depot Popcorn
This week, you’ll hear more of the same. While construction is nearly complete, finishing the shop floor has become the…
Read More
005. The Shop is Blue
Today, Rachael talks about painting the shop and the next steps for construction, pop drop success, and Travis hints about…
Read More
Limited Edition Tshirt Design
Our pal, Blake, designed this rad logo for our limited edition tshirts: Head over to http://rachmakescakes.bigcartel.com and get one while…
Read More
004. Welcome to the Neighborhood
This week Rachael talks about the O4W Business Association, dropping cake pops at coffee shops, the limited edition tshirt design,…
Read More
003. Drop It Like a Cake Pop
Rachael pushes forward with the construction process on the shop and reveals a bit of her marketing plan. She also…
Read More
- « Previous Page
- 1
- …
- 61
- 62
- 63
- 64
- 65
- …
- 94
- Next Page »